The customer’s DR site (Vmware) is scheduled to be down due to electricity problems.
(about 12 hours)
What procedures are needed in Zerto to make it stable?
Should I pause the VPGs in the Main ZVM?
Is it safe to shut down the Main ZVM and VRA?
Or shut down DR Zerto and VMWare and leave Main intact?